Singulex Laboratory
and Offices

Alameda, CA

A soon to expire lease and need for expansion brought biotech company Singulex Inc. to MWA needing to quickly locate and design a new facility. MWA was able to assist in the selection of a 51,000sf building that allows them to accommodate current needs and future expansion.

Working collaboratively with Singulex, MWA completed the design and obtained a building permit within 2 months. By phasing the project, the labs were built 3 months prior to the move-in date, allowing Singulex to properly test all equipment and easily pass all certifications.

Large windows maximize natural light in the ground floor Laboratory and Manufacturing spaces. Scientists and lab technicians work on special benches near windows providing abundant natural light while ancillary spaces such as cold rooms and storage reside at the core of the building. A mix of private and open offices, conference rooms and a large break room on the 2nd Floor takes full advantage of natural light and Bay views.

Client: Singulex Inc.
Cost: N/A
Completion: January 2013

Photos: Russell Abraham